Pipe Production Principle
The plastic pipe extrusion process is divided into three stages:
1. In the first stage of plasticization for raw materials PVC and other additives, the materials mixtures are heated and completely sheared inside the extruder to make the solid raw materials into a homogenized viscous fluid;
2. In the forming stage, which is under the action of the extruder's extruding parts, the molten material is continuously passed through the forming head at a certain pressure and speed to obtain a certain cross-sectional shape;
3. In final stage of cooling and setting, by sizing and cooling treatment, the molten PVC material will form the certain shape and become a solid state (plastic pipe).
The above three stages are realized by the main machine and auxiliary machine, or extrusion unit. Specifically, the main machine is an extruder, and the auxiliary machine includes a machine head, a shaping device, a cooling device, a haul-off device, a cutting device, and a stacking table.
PVC Production Line Flow Chart
PVC Pipe Application&Advantage
1,Electricity or cable pipe
2,Water distribution system.
3,Irrigation plants
4,Garden hose
5,Ventilation(large PVC pipe)
6,Drainage(large PVC pipe)
7,Low cost of pipe
8,Low cost for installation
9,Easy to install and durable in use
10,Anti corrusion
11,Low fluid friction
After-Sales Service
1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated,
e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b.
Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, ACEMIEN will provide the buyer spare parts at cost price.
c. Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
Business Contact
Sales Manager: Kevin Lu