No. | Machine | Qty. | Remark |
1 | Screw loader for SJZ 80/156 extruder | 1set | Glazed tile extrusion line Ridge tile forming |
2 | SJZ 80/156 conical twin-screw extruder(PVC) | 1set | |
3 | Vacuum loader and drying hopper | 1set | |
4 | SJ50/30 single screw extruder(ASA) | 1set | |
5 | Extrusion mould / distributor | 1set/1set | |
6 | Embossing roller | 1set | |
7 | Glazed-tile forming machine | 1set | |
8 | Cutter | 1set | |
9 | Stacker | 1set | |
10 | Ridge tile Oven | 1set | |
11 | Ridge tile Forming machine and mould | 4set | |
12 | Screw loader for SRL-Z300/600 Mixer | 1set | Auxiliary equipment |
13 | SRL-Z300/600 Mixer unit | 1set | |
14 | PC500 Crusher | 1set | |
15 | MF550 Pulverizer | 1set | |
16 | Ridge roof forming machine(Optional) 1. Flat sheet haul-off unit 2. Oven 3. Ridge tile forming unit 4. Ridge tile mold (4sets) |
Raw material & formulation | PVC powder, CaCO3, CPE, PE-WAX, Stearic acid, Compound stabilizer, ACR, paraffin, ASA granule |
Description final product & Output capacity | Two layers PVC+ASA Co-extrusion Glazed tile; Width: 1040mm, Thickness: 2~3mm; Output: 300-400kg/h(Depending on CaCO3 proportion) For 2.5mm thickness, Capacity about 2000 Sqr/day |
Warehouse/Workshop | Dimension (M*M*M): 25(Length)×5(width) ×3.5 (Height) Crane: Machine positioning |
Temperature & Humidity | ≤40ºC, ≤95% |
Power supply | 3-phase, 380 V, 50 Hz(or customized) |
Wire/cables: | Wires/cables from power supply to control cabinet of this production line; |
Cooling Water hose/pipe | Water supply to machines and pools |
Lubrication oil: | Exxon mobile |
Compressor | 7.5KW(0.6-0.8MPa) |
Installation power | Total 287KW, Actual consumption about 70% Suggested 200kVA transformer Needing at least 160kVA transformer |
Cooling Water | ≤20ºC, ≥0.3MPa, ~5-6tons/hr |
Compressed air | 0.3m3/min, >0.6MPa |