Jiangsu, China
Business Type:
Manufacturer/Factory & Trading Company
Number of Employees:
80
Year of Establishment:
2013-03-13
Management System Certification:
ISO 9001
Average Lead Time:
Peak season lead time: one month
Off season lead time: one month
OEM/ODM Service
Sample Available

Construction Formwork Machine, Hollow Plastic Formwok Machine, PP Construction Board Machine manufacturer / supplier in China, offering Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design, Pet Bottles Waste Plastic Crushing Washing Recycling Machine Recycling Line, One Layer PVC Corrugated Roof Tile Machine/Extruder and so on.

Diamond Member Since 2018
Audited Supplier
Supplier Homepage Products Plastic extrusion machine Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design
  • Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design
  • Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design
  • Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design
  • Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design
  • Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design

Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design

Min. Order / Reference FOB Price
1 Piece US $150,000/ Piece
Port: Shanghai, China
Production Capacity: 120 Sets Per Year
Payment Terms: L/C, T/T, Western Union, Paypal, Money Gram
Product Type: PP Board
Board Layers: Multilayer
Screw No.: Single-screw
Automation: Automatic
Computerized: Computerized
Certification: CE, ISO9001:2008

You Might Also Like

Loading...

Basic Info.

Model NO.
ACMPPH01
Customized
Customized
Condition
New
Overall Dimension
30X5X5m
Power Rated
100-220kw
Producing Capacity
300PCS Sheets Per 24 Hours
Sheet Thickness
Usually 12-20mm
Voltage
380V 50Hz or Customized
OEM
Yes
APP Remote Control
Yes
Guarantee
12 Months
Technical Support
Service and Data Sheet Available for Oversea
Trademark
ACEMIEN
Transport Package
Film Wrapped in Wood Case or Crate
Specification
915x1830mm or 1220x2440mm
Origin
P. R. China
Principle of Production
Typically,the production line is to produce 3 layers(ABA)hollow construction formwork. Adopting three layer distributor and co-extrusion technology, the material pp(or recycled pp) and other additives go through a complete production in which all these materials heated,mixed,sheared,and co-extrudered in single screw extruders to finally form the three layer pp hollow formwork sheet in the T-die mould whose thickness can be adjusted,then the extruded 3 layer sheet is hauled forward to a calibration station where it is cooled andvacuum calibrattheed for certain shape,and finally cut and stacked.

Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design
Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design
Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design
Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design


Flowchart for PP Formwork Production Line
Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design

Engineering Drawing and Equipment List
Plastic Building Formwork PP Hollow Construction Sheet Making Machine with Innovated Design

PP Hollow Formwork Advantage

1.Light in weight, high strength,high hardness, impact resistant, tear resistant.
2.Surface is smooth,bright and clean,then to make the concrete block surface smooth.

3.Good concrete forming.
4.Moisture absorption,no deformation,mildew resistant,steady in size,especially suitable for underground and damp environment.
5.Acid and alkali resistant, corrosion resistant, preservative treatment is not required both during use and storage of formwork,and will not make any pollution.
6.The reusable time for pp hollow sheet can reach more than 50 times,long service time.
7.Eco-friendly,can be recycled to granulate to feed as raw material.


PP Hollow Construction Formwork Comparing to other Construction Sheet
Item comparedPP hollow formwork sheetPVC sandwich formwork sheetWood formwork sheetAluminum formwork sheetBamboo plywood sheet
Unit Price CNY/m28411035140039
Recycling times5020-304-680-1008-10
10m Fall off testNo deformationNo deformationCrackedDeformedSlightly cracked
Anti-abrasionYesYesNoYesNo
Shape after water absorptionRemain sameRemain sameTransformedRemain sameTransformed
DemouldEasyEasyHardHardHard
Nail staplingEasyHardEasyCan notEasy
Swelling and shrinkageSlightlyDepending on temperatureSlightlySlightlySlightly
Eco-friendlyRecyclableRecyclableNearly non-recyclable,consumption more timber resourcesRecyclableNearly non-recyclable,consumption more timber resources
Weight kg/m27137.2256.5
Project timeShortLongerShortLongShort
Cost in average1.53.57.3134.5

Aftersales Service
1.Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. ACEMIEN will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD100 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 12 months since date of bill of lading
During this guarantee period, ACEMIEN will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, ACEMIEN will provide the buyer spare parts at cost price.
c. Long-term service:
ACEMIEN will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
4. Validity: Three months since quotation date.
We thank you for your inquiry and would be pleased to receive your order soon.

 

Send your message to this supplier

*From:
*To:
avatar Mr. Clark
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now